EMPLOYEE CORNER | CLIENT FTP

CONSIPH3A -Reconstruction of Storm and Sanitary Sewer, Trunk, and Distribution Water Main in Coney Island Area – Phase 3A Brooklyn

JED Engineering has been retained as a subconsultant to provide REI services for the reconstruction of storm and sanitary sewer, trunk, and distribution water main in West 16th Street from Hart Place to Surf Avenue and Surf Avenue from W17th Street to Stillwell Avenue.

The work includes the installation of the following:

  • The installation of 6, 8, 12 & 20 Inch Water main complete with hydrants.
  • Installation of 10, 12 & 15 inch ESVP Sanitary Sewer.
  • The installation of new curbs/sidewalks, catch basins, street lighting, traffic signals work, street Lights, and Fire Alarm
  • Full roadway restoration including roadway base, asphalt & street marking.

Installation of various types of Storm Sewer such as:

  • 5.5′ W x 2.5′ H – Double Barrel – Flat Top – RC 
  • 7.0′ W x 3.0′ H Double Barrel – Flat Top – RC  
  • 3.0′ W x 2.0′ H Double Barrel – Flat Top – RC 
  • 5.5′ W x 2.0′ H Single Barrel – Flat Top – RC  
  • 6.0′ W x 5.0′ H Single Barrel – Flat Top – RC 
  • Catch Basin

 

Contract Cost: $ 49,000,000                                 

Status: Anticipated Completion November 2023